Infrastructure

New Alamein City

A new beachfront city in northwest Egypt serving as a modern Mediterranean destination. Gabtic engineered Armstrong pumping infrastructure for HVAC and domestic water distribution across the entire planned development.

Site Area
City-wide development
Scope
HVAC & water booster systems
Partner
Armstrong, Wilo
Sector
Infrastructure
New Alamein City
The Brief

New Alamein City, officially inaugurated by Egyptian President on March 1, 2018, required scalable infrastructure for thousands of residential and commercial units. The challenge: engineer city-wide HVAC and domestic water systems for reliable service across all developments.

What We Supplied

Armstrong HVAC horizontal end suction and split case pumps. Wilo domestic booster sets. Complete city-wide water and climate system infrastructure.

Scope of Supply
HVAC pumps
Armstrong horizontal end suction & split case
Booster sets
Wilo domestic boosters
Scope
City-wide infrastructure
Inauguration date
March 1, 2018
Scale
Multiple residential & commercial zones
Location
Northwest Egypt, Mediterranean coast
Project Accomplishments

Key achievements & impact

✓
Engineered HVAC systems for entire planned city
✓
Scalable booster infrastructure for domestic water
✓
Air separation and expansion for system longevity
Contact UsNew Alamein City Case Study | Gabtic