
Selected Work
Eleven landmark builds. Every one engineered, not just supplied.
From a 110,000 m² museum to Africa’s largest district cooling plant, each project here was sized, specified and supported by Gabtic’s engineering team — not pulled off a shelf.
Published case studies
Gabtic projects, as documented by Armstrong
- How Armstrong’s HVAC systems help protect Egypt’s priceless artefactsArmstrong Fluid Technology
Armstrong on the Grand Egyptian Museum: HVAC pumping and pressurisation delivered in partnership with Gabtic Engineering across the 110,000 m² complex.
Article · (opens in a new tab)
- Balancing drives energy savings: chemical manufacturing facility, EgyptArmstrong Fluid Technology
Official Armstrong case study: a Gabtic retrofit with Design Envelope pumps and Pump Manager cut pumping power from 116 kW to 44.3 kW, saving over $21,000 a year.
Case study · PDF · (opens in a new tab)

